The 380 kV “Ittiri-Codrongianos” power transmission line
Ittiri-Codrongianos (Sardegna – ITALIA)
05/03/2010 - 30/03/2011
Terna Rete Italia S.p.A.
Construction of a new power transmission line with 31.5 mm ACSR conductors 31.5 mm diameter ACSR cable with three triple-bundle phases and two Alumoweld guard wire with attached optical fibre, galvanised steel pylons, plinth foundations and TUBFIX reinforced concrete micropiles. The total length of the power transmission line is 11.9 km.