SUDBURGENLAND – WIEN SUDEST
AUSTRIA
1997-1999
Verbund – Austrian Power Grid GmbH
Project for the construction of the 380 kV overhead power line – doubletwin-triad– called “Sudburgenland – WienSudost” with a total length of 37 km.
The project also included the demolition of the existing 220 kV overhead power line.
The contractual activities were carried out ina workmanlikemanner in full compliance with the technical conditions and the complex environmental regulations in force in Austria.