ARACHTHOS-AETOS-ACHELOOS

1999-2000
Public Power Corporation, PPC

Project for the construction of the 400 kV – direct current – Arachthos-Aetos power line and the 400 kV – alternating current – Arachthos-Achelooos power line for a total length of 180 km.