FILIPPOI – NEA SANTA
GREECE
2006-2008
Public Power Corporation, PPC
Project for the supply of the OPGW cable and the construction of the 400 kV – direct current overhead power line called ”Filippoi– Nea Santa” and the 400 kV – alternating current – overhead power line called ”Nea Santa – Turkey” for a total length of 210 km.