SUDBURGENLAND – WIEN SUDEST

AUSTRIA

1997-1999
Verbund – Austrian Power Grid GmbH

Project for the construction of the 380 kV overhead power line – double twin-triad – called “Sudburgenland – Wien Sudost” with a total length of 37 km. 
The project also included the demolition of the existing 220 kV overhead power line. 
The contractual activities were carried out in a workmanlike manner in full compliance with the technical conditions and the complex environmental regulations in force in Austria.