ROSE 3/4/5/6
2006-2007-2008
RTE – GESTIONNAIRE DU RESEAU
“WRAP” project for the installation of fibre optic cable wrapped around existing conductors and guard cables on 66, 132, 225, 380 kV overhead power lines in various regions of France for a total length of 450 km.