150 kV “Bisaccia-Lacedonia” power transmission line
Bisaccia-Lacedonia (Campania – ITALIA)
2015-2016
Alisea Srl
Executive design, supply of materials and construction of a new dual three-phase power line with 3.5 mm diameter ACSR [Aluminium Conductor Steel Reinforced] conductors and guard wire with attached optical fibre, galvanised steel pylons and reinforced concrete plinth foundations with reinforced concrete piles. The total length of the power line is 14.0 km.