The Legnaro electrical power station

Legnaro (Veneto – ITALIA)

2006-2008
INFN Legnaro PD

This project consisted of the complete construction the new “armoured” station (special equipment supplied and assembled by ABB) of the National Institute of Nuclear Physics of Legnaro (PD); in this case, in addition to all the applicable civil works (from the perimeter fence to the building yard etc.) we also installed the electrical line to the ENEL electrical station in Camin, with HV (132 kV) underground cable extending over almost 4 km.